|
Sampling Plan
This sampling plan is applicable to receiving inspection,
in-process inspection and final inspection.
The chart, as follows, is based upon normal operations
assuming the equipment is capable of holding the required tolerances. In
the event there are other circumstances such as tight tolerances, difficult
material or operations that are historically difficult to produce, the inspector
will initiate a tighter inspection plan as required. The customer may establish
the sampling plan as per purchase order and specification requirements.
If a tightened sample plan is determined necessary,
this shall be noted on the reverse side of the Manufacturing Operations
Sheet.
|
This page is best viewed with a screen
resolution of 800x600 or higher with Netscape 4.0 or Internet Explorer 4.0.
|